References
Areas of activity
Sewage treatment plants
Biogas plants
2023 – 2024
Launch year
Tarnowskie Góry - Repty
Investment: Carry out a Functional and Utility Programme (PFU) for Waterworks Company in Tarnowskie Góry – Veolia. The exact name of the project is : “Preparation of Functional and Utility Programme PFU with an extended technological part and guidelines for other branches, concerning the modernisation of the biological part at the “Repty” Wastewater Treatment Plant”.
Duration: 2023
Qaverage = 2 375 m3/d
Toruń
Investment: Investment named “Modernization and expansion of sludge management at the Central Sewage Treatment Plant in Toruń – inclusion of WKFZ.3 into parallel operation”
Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision .
Holding the possition of manager / start-up technologist.
Duration: 2024
Qaverage = 90 000 m3/d
Jelcz-Laskowice
Investment: Extension and modernisation of the Jelcz-Laskowice wastewater treatment plant.
Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision .
Holding the possition of manager / start-up technologist.
Duration: 2024
Qaverage = 4 500 m3/d
33 500 P.E.
2021 – 2022
Launch year
Biała Podlaska
Investment: “Extension and modernization of the wastewater treatment plant.”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2021-2022
Qaverage = 12 500 m3/d
Bielsk Podlaski
Investment: “Reconstruction and extension of the sewage treatment plant in Bielsk Podlaski, including reconstruction of the main pumping station and accompanying infrastructure.”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2021-2022
Qaverage = 6000 m3/d
Żyrardów
Investment:
Designing and executing a task under the name:
“Modernization
(Reconstruction) of the Sewage Treatment Plant in Żyrardów”
“Reconstruction of the pumping station at street Gdańska in Żyrardów “
Terms of reference:
Works related to comprehensive technological service in the field of technological consulting and implementation of start-up works as part of the investment task and preparation of the necessary start-up and post-start-up documentation
Duration: 2021-2022
Qaverage = 12 500 m3/d
SW "Łeba"
Investment: Technological conception.
Terms of reference: Carring out a technological conception for the modernization and expansion of the sludge section of the Łeba Wastewater Treatment Plant with an installation for anaerobic stabilization of excessive sludge based on a complete methane fermentation node with biogas production and its use for electric and thermal energy production.
Duration: 2021
Qaverage =7 500 m3/d
Nakło nad Notecią
Investment: Technological conception
Terms of reference: Carring out a technological conception for the modernization and expansion of the sludge section of the Wastewater Treatment Plant in Nakło nad Notecią with an anaerobic waste stabilization installation based on a complete methane fermentation unit with biogas production and its use for the production of electricity and heat as well as processing of post- fermentation sludge.
Duration: 2022
Qaverage =4 900 m3/d
Jabłonka
Investment:
Implementation of a concept for the construction of a biogas plant at the Sewage Treatment Plant in Jabłonka
Terms of reference: Carrying out a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.
Duration: 2021
SW "Łeba"
Investment: “Implementation of innovations in the energy-fertilising treatment of sewage sludge and biodegradable waste, reducing negative environmental impacts
in a coastal tourist region.”
Terms of reference: Performing the function
of a technologist in the field
of sludge preparation for sequential fermentation, sequential operation of biogas plants and co-fermentation with biodegradable waste.
Duration: 2022-2023
Qaverage =7 500 m3/d
Pełczyce
Investment: “Extension and reconstruction of the treatment plant in Pełczyce.”
Terms of reference:
Works related to comprehensive technological service in the field of technological consulting and implementation of start-up works as part of the investment task and preparation of the necessary start-up and post-start-up documentation
Duration: 2022-2023
Qaverage = 900 m3/d
Municipal sewage treatment plants
Investment: “Technology consulting and commissioning work including preparation of commissioning and post-commissioning documentation for the investment in Dobroszyce, Kcynia, Klincz Wielki, Strzelce Krajeńskie and Kałuszyn.”
Terms of reference:
Coordination and supervision of commissioning work , working as Commissioning Manager/Technologist
Duration: 2022-2023
Kościerzyna
Investment: Extension of the wastewater treatment plant in Kościerzyna in the field of sludge management.
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2022-2023
Qaverage = 3 500 m3/d
Łowicz
Investment: “Reconstruction and extension of the sewage treatment plant in Łowicz -Task IB (without hydrolysis).”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2022-2023
Qaverage = 13 000 m3/d
Białobrzegi
Investment: “Implementation of a technological concept for the Sewage Treatment Plant in Białobrzegi.”
Terms of reference:
Development of a comprehensive
pre-investment analysis which will estimate the possibility of using the potential of biogas from municipal sewage sludge at the sewage treatment plant in Białobrzegi. Carry out a technical and economic audit and developing a concept for the modernization and expansion of the sludge part of the sewage treatment plant.
Duration: 2022
Qaverage =4 000 m3/d
Wołomin
Investment: Technological start-up of a sludge thickening installation with a capacity of 55 m3 / h, equipped with an AS-H belt thickener by Alfa Laval at the Wastewater Treatment Plant in Wołomin.
Duration: 2021
Bratoszewice
Investment: “Extension of the wastewater treatment plant in Bratoszewice”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2021
Qaverage = 550 m3/d
Wola Krzysztoporska
Investment: “Extension of the wastewater treatment plant in Wola Krzysztoporska with a reactor and biogas plant.”
In cooperation with Termoprojekt Zachód Sp. z o.o.
Terms of reference: Carrying out a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.
Duration: 2021
Qaverage =12 000 m3/d
2019 – 2020
Launch year
Elbląg
Investment: “Extension and modernization of the wastewater treatment plant in Elbląg street Mazurska 47- Element 1 implemented under the project: “Modernisation of waste water management in Elbląg agglomeration”
Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision. Holding the position of manager / start-up technologist.
Duration: 2020 – 2023
Qaverage = 22 000 m3/d
Biogas Plants Kutno 1 & 2
Investment: “Consultation and technological supervision carried out during the construction process of the Biogas Plant Kutno 2 (power 0.5 MW) and process optimisation of the the Biogas Plant Kutno 1 (power 1.0 MW)”
Terms of reference:
support in design works,
technological supervision,
participation in acceptance work,
analysis of plant operation during commissioning,
analysis and optimisation of control systems.
Duration: 2020 – 2021
Białobrzegi
Investment: “Construction (modernization) and extension of the wastewater treatment plant in Białobrzegi”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2020 – 2021
Qaverage = 4 000 m3/d
Chrzanów Duży
Investment: “Modernisation of the biological part of the wastewater treatment plant in Chrzanów Duży” – task SD, AB and F (Grodzisk Mazowiecki)
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2019 – 2021
Qaverage = 21 000 m3/d
Mogilno
Investment: “Extension and modernization of the wastewater treatment plant in Mogilno”
Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision.
Duration: 2020 – 2021
Qaverage = 5 000 m3/d
Dęblin
Investment: “Extension and modernization of the wastewater treatment plant in Dęblin”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2019 – 2020
Qaverage = 4 000 m3/d
Józefów
Terms of reference: Optimising the operation of the Bucher Unipektin AG piston press for sludge dewatering.
Duration: 2019
2017 – 2018
Launch year
Chynów
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2018 – 2019
Qaverage = 509 m3/d
Kościan
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2017 – 2019
Qaverage = 5 500 m3/d
Łask
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist. Coordination and supervision of start-up works for the whole task,
Duration: 2017 – 2019
Qaverage = 8 000 m3/d
Garwolin
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2017 – 2018
Qaverage = 5 500 m3/d
2013 – 2016
Launch year
Skarżyn
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2015 – 2016
Heat output: 1,6 MWt
Swarzewo
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2013 – 2016
Qaverage = 12 000 m3/d
Tomaszów Mazowiecki
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2013 – 2015
Qaverage = 12 000 m3/d
J.V. Technology Witold Woroszyłło
EU VAT: PL 645-257-24-13
REGON: 520655980
Bank account: Santander Bank Polska S.A.
75 1090 1825 0000 0001 4928 2905
Photographs and text are property of J.V. Technology Witold Woroszyłło Sp. z o.o.
Poland
41-922 Radzionków
Street: Męczenników Oświęcimia 25/1
Silesia