References

J.V. Technology Witold Woroszyłło

Areas of activity

R

Sewage treatment plants

R

Biogas plants

2021 – 2022

Launch year

Biała Podlaska

in progress

Investment: “Extension and modernization of the wastewater treatment plant.”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2021-2022

Qaverage = 12 500 m3/d

Bielsk Podlaski

in progress

Investment: “Reconstruction and extension of the sewage treatment plant in Bielsk Podlaski, including reconstruction of the main pumping station and accompanying infrastructure.”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2021-2022

Qaverage = 6000 m3/d

Wola Krzysztoporska

in progress

Investment: “Extension of the wastewater treatment plant in Wola Krzysztoporska with a reactor and biogas plant.”
In cooperation with Termoprojekt Zachód Sp. z o.o.

Terms of reference: Carrying out  a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.

Duration: 2021-2022

Qaverage =12 000 m3/d

SW "Łeba"

in progress

Investment: Technological conception.

Terms of reference: Carring out  a technological conception for the modernization and expansion of the sludge section of the Łeba Wastewater Treatment Plant with an installation for anaerobic stabilization of excessive sludge based on a complete methane fermentation node with biogas production and its use for electric and thermal energy production.

Duration: 2021-2022

Qaverage =7 500 m3/d

2019 – 2020

Launch year

Elbląg

in progress

Investment: “Extension and modernization of the wastewater treatment plant in Elbląg street Mazurska 47- Element 1 implemented under the project: “Modernisation of waste water management in Elbląg agglomeration”

Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision. Holding the position of manager / start-up technologist.

Duration: 2020 – 2021

Qaverage = 22 000 m3/d

Biogas Plants Kutno 1 & 2

in progress

Investment: “Consultation  and technological supervision carried out during                      the construction process          of the Biogas Plant Kutno 2 (power 0.5 MW)  and process optimisation of the  the Biogas Plant Kutno 1                       (power 1.0 MW)”

Terms of reference:

support in design works,
technological supervision,
participation in acceptance work,
analysis of plant operation during commissioning,
analysis and optimisation of control systems.

Duration: 2020 – 2021

 

Białobrzegi

in progress

Investment: “Construction (modernization) and extension of the wastewater treatment plant in Białobrzegi”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2020 – 2021

Qaverage = 4 000 m3/d

Chrzanów Duży

Investment: “Modernisation of the biological part of the wastewater treatment plant in Chrzanów Duży” – task SD, AB and F (Grodzisk Mazowiecki)

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2019 – 2021

Qaverage = 21 000 m3/d

Mogilno

in progress

Investment: “Extension and modernization of the wastewater treatment plant in Mogilno”

Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision.

Duration: 2020 – 2021

Qaverage = 5 000 m3/d

Jaworzno – Dąb

Investment: “Modernization of the wastewater treatment plant in Jaworzno – Dąb Stage II”

Terms of reference: Carrying out commissioning works together with developing the necessary tests and documentation.

Duration: 2019 – 2020

Dęblin

Investment: “Extension and modernization of the wastewater treatment plant in Dęblin”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2019 – 2020

Qaverage = 4 000 m3/d

Józefów

Investment: “Integration and development of water and sewage management in Józefów”. Wastewater treatment plant in Józefów.

Terms of reference: Optimising the operation of the Bucher Unipektin AG piston press for sludge dewatering.

Duration: 2019

2017 – 2018

Launch year

Chynów

Investment: “Modernization and extension of the wastewater treatment plant in Sułkowice together with the management of municipal sewage sludge for the commune of Chynów in the town of Sułkowice”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2018 – 2019

Qaverage = 509 m3/d

Kościan

Investment: “Extension and modernization of the wastewater treatment plant” for Kościan in Kiełczewo

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2017 – 2019

Qaverage = 5 500 m3/d

Łask

Investment: “Extension and modernization of the wastewater treatment plant in Łask”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist. Coordination and supervision of start-up works for the whole task,

Duration: 2017 – 2019

Qaverage = 8 000 m3/d

Garwolin

Investment: “Extension and modernization of the wastewater treatment plant in Garwolin”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2017 – 2018

Qaverage = 5 500 m3/d

2013 – 2016

Launch year

Skarżyn

Investment: “Construction of a 1,56 MW electrical and heat generation installation form biogas in Skarżyn”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2015 – 2016

Heat output: 1,6 MWt

Swarzewo

Investment: “Extension and modernization of the wastewater treatment plant in Swarzewo”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2013 – 2016

Qaverage = 12 000 m3/d

Tomaszów Mazowiecki

Investment: “Modernization of the wastewater treatment plant and sewerage system for Tomaszów Mazowiecki agglomeration: Task No. 1.1, Task No. 1.2, Task No. 1.3.1a, Task No. 1.3.1.b”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2013 – 2015

Qaverage = 12 000 m3/d

Full reference list available in our headquarter

J.V. Technology Witold Woroszyłło

EU VAT: PL 626-245-69-97
REGON: 241286998

Bank account: Santander Bank Polska S.A.
18 1090 1825 0000 0001 4345 0351

Poland

41-922 Radzionków
Street: Szymały 85
Silesia

+48 664 905 750

kontakt@jv-technology.pl

Website design: eSpark Karol Wilczek