References
Areas of activity
Sewage treatment plants
Biogas plants
2021 – 2022
Launch year
Biała Podlaska
Investment: “Extension and modernization of the wastewater treatment plant.”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2021-2022
Qaverage = 12 500 m3/d
Bielsk Podlaski
Investment: “Reconstruction and extension of the sewage treatment plant in Bielsk Podlaski, including reconstruction of the main pumping station and accompanying infrastructure.”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2021-2022
Qaverage = 6000 m3/d
Żyrardów
Investment:
Designing and executing a task under the name:
“Modernization
(Reconstruction) of the Sewage Treatment Plant in Żyrardów”
“Reconstruction of the pumping station at street Gdańska in Żyrardów “
Terms of reference:
Works related to comprehensive technological service in the field of technological consulting and implementation of start-up works as part of the investment task and preparation of the necessary start-up and post-start-up documentation
Duration: 2021-2022
Qaverage = 12 500 m3/d
SW "Łeba"
Investment: Technological conception.
Terms of reference: Carring out a technological conception for the modernization and expansion of the sludge section of the Łeba Wastewater Treatment Plant with an installation for anaerobic stabilization of excessive sludge based on a complete methane fermentation node with biogas production and its use for electric and thermal energy production.
Duration: 2021
Qaverage =7 500 m3/d
Nakło nad Notecią
Investment: Technological conception
Terms of reference: Carring out a technological conception for the modernization and expansion of the sludge section of the Wastewater Treatment Plant in Nakło nad Notecią with an anaerobic waste stabilization installation based on a complete methane fermentation unit with biogas production and its use for the production of electricity and heat as well as processing of post- fermentation sludge.
Duration: 2022
Qaverage =4 900 m3/d
Jabłonka
Investment:
Implementation of a concept for the construction of a biogas plant at the Sewage Treatment Plant in Jabłonka
Terms of reference: Carrying out a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.
Duration: 2021
SW "Łeba"
Investment: “Implementation of innovations in the energy-fertilising treatment of sewage sludge and biodegradable waste, reducing negative environmental impacts
in a coastal tourist region.”
Terms of reference: Performing the function
of a technologist in the field
of sludge preparation for sequential fermentation, sequential operation of biogas plants and co-fermentation with biodegradable waste.
Duration: 2022-2023
Qaverage =7 500 m3/d
Pełczyce
Investment: “Extension and reconstruction of the treatment plant in Pełczyce.”
Terms of reference:
Works related to comprehensive technological service in the field of technological consulting and implementation of start-up works as part of the investment task and preparation of the necessary start-up and post-start-up documentation
Duration: 2022-2023
Qaverage = 900 m3/d
Municipal sewage treatment plants
Investment: “Technology consulting and commissioning work including preparation of commissioning and post-commissioning documentation for the investment in Dobroszyce, Kcynia, Klincz Wielki, Strzelce Krajeńskie and Kałuszyn.”
Terms of reference:
Coordination and supervision of commissioning work , working as Commissioning Manager/Technologist
Duration: 2022-2023
Kościerzyna
Investment: Extension of the wastewater treatment plant in Kościerzyna in the field of sludge management.
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2022-2023
Qaverage = 3 500 m3/d
Łowicz
Investment: “Reconstruction and extension of the sewage treatment plant in Łowicz -Task IB (without hydrolysis).”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2022-2023
Qaverage = 13 000 m3/d
Białobrzegi
Investment: “Implementation of a technological concept for the Sewage Treatment Plant in Białobrzegi.”
Terms of reference:
Development of a comprehensive
pre-investment analysis which will estimate the possibility of using the potential of biogas from municipal sewage sludge at the sewage treatment plant in Białobrzegi. Carry out a technical and economic audit and developing a concept for the modernization and expansion of the sludge part of the sewage treatment plant.
Duration: 2022
Qaverage =4 000 m3/d
Wołomin
Investment: Technological start-up of a sludge thickening installation with a capacity of 55 m3 / h, equipped with an AS-H belt thickener by Alfa Laval at the Wastewater Treatment Plant in Wołomin.
Duration: 2021
Bratoszewice
Investment: “Extension of the wastewater treatment plant in Bratoszewice”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2021
Qaverage = 550 m3/d
Wola Krzysztoporska
Investment: “Extension of the wastewater treatment plant in Wola Krzysztoporska with a reactor and biogas plant.”
In cooperation with Termoprojekt Zachód Sp. z o.o.
Terms of reference: Carrying out a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.
Duration: 2021
Qaverage =12 000 m3/d
2019 – 2020
Launch year
Elbląg
in progress
Investment: “Extension and modernization of the wastewater treatment plant in Elbląg street Mazurska 47- Element 1 implemented under the project: “Modernisation of waste water management in Elbląg agglomeration”
Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision. Holding the position of manager / start-up technologist.
Duration: 2020 – 2023
Qaverage = 22 000 m3/d
Biogas Plants Kutno 1 & 2
Investment: “Consultation and technological supervision carried out during the construction process of the Biogas Plant Kutno 2 (power 0.5 MW) and process optimisation of the the Biogas Plant Kutno 1 (power 1.0 MW)”
Terms of reference:
support in design works,
technological supervision,
participation in acceptance work,
analysis of plant operation during commissioning,
analysis and optimisation of control systems.
Duration: 2020 – 2021
Białobrzegi
Investment: “Construction (modernization) and extension of the wastewater treatment plant in Białobrzegi”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2020 – 2021
Qaverage = 4 000 m3/d
Chrzanów Duży
Investment: “Modernisation of the biological part of the wastewater treatment plant in Chrzanów Duży” – task SD, AB and F (Grodzisk Mazowiecki)
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2019 – 2021
Qaverage = 21 000 m3/d
Mogilno
Investment: “Extension and modernization of the wastewater treatment plant in Mogilno”
Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision.
Duration: 2020 – 2021
Qaverage = 5 000 m3/d
Dęblin
Investment: “Extension and modernization of the wastewater treatment plant in Dęblin”
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2019 – 2020
Qaverage = 4 000 m3/d
Józefów
Terms of reference: Optimising the operation of the Bucher Unipektin AG piston press for sludge dewatering.
Duration: 2019
2017 – 2018
Launch year
Chynów
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2018 – 2019
Qaverage = 509 m3/d
Kościan
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2017 – 2019
Qaverage = 5 500 m3/d
Łask
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist. Coordination and supervision of start-up works for the whole task,
Duration: 2017 – 2019
Qaverage = 8 000 m3/d
Garwolin
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2017 – 2018
Qaverage = 5 500 m3/d
2013 – 2016
Launch year
Skarżyn
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2015 – 2016
Heat output: 1,6 MWt
Swarzewo
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2013 – 2016
Qaverage = 12 000 m3/d
Tomaszów Mazowiecki
Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.
Duration: 2013 – 2015
Qaverage = 12 000 m3/d
J.V. Technology Witold Woroszyłło
EU VAT: PL 645-257-24-13
REGON: 520655980
Bank account: Santander Bank Polska S.A.
75 1090 1825 0000 0001 4928 2905
Photographs and text are property of J.V. Technology Witold Woroszyłło Sp. z o.o.
Poland
41-922 Radzionków