References

J.V. Technology Witold Woroszyłło

Areas of activity

R

Sewage treatment plants

R

Biogas plants

2023 – 2024

Launch year

Tarnowskie Góry - Repty

in progress

Investment: Carry out a Functional and Utility Programme (PFU) for  Waterworks Company in Tarnowskie Góry – Veolia. The exact name of the project is : “Preparation of Functional and Utility Programme PFU with an extended technological part and guidelines for other branches, concerning the modernisation of the biological part at the “Repty” Wastewater Treatment Plant”.

Duration: 2023

Qaverage = 2 375 m3/d

2021 – 2022

Launch year

Biała Podlaska

 

Investment: “Extension and modernization of the wastewater treatment plant.”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2021-2022

Qaverage = 12 500 m3/d

Bielsk Podlaski

 

Investment: “Reconstruction and extension of the sewage treatment plant in Bielsk Podlaski, including reconstruction of the main pumping station and accompanying infrastructure.”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2021-2022

Qaverage = 6000 m3/d

Żyrardów

 

Investment:
Designing and executing a task under the name:
“Modernization
(Reconstruction) of the Sewage Treatment Plant in Żyrardów”
“Reconstruction of the pumping station at street Gdańska in Żyrardów “

Terms of reference:
Works related to comprehensive technological service in the field of technological consulting and implementation of start-up works as part of the investment task and preparation of the necessary start-up and post-start-up documentation

Duration: 2021-2022

Qaverage = 12 500 m3/d

SW "Łeba"

 

Investment: Technological conception.

Terms of reference: Carring out  a technological conception for the modernization and expansion of the sludge section of the Łeba Wastewater Treatment Plant with an installation for anaerobic stabilization of excessive sludge based on a complete methane fermentation node with biogas production and its use for electric and thermal energy production.

Duration: 2021

Qaverage =7 500 m3/d

Nakło nad Notecią

 

Investment: Technological conception

Terms of reference: Carring out a technological conception for the modernization and expansion of the sludge section of the Wastewater Treatment Plant in Nakło nad Notecią with an anaerobic waste stabilization installation based on a complete methane fermentation unit with biogas production and its use for the production of electricity and heat as well as processing of post- fermentation sludge.

Duration: 2022

Qaverage =4 900 m3/d

Jabłonka

 

Investment:
Implementation of a concept for the construction of a biogas plant at the Sewage Treatment Plant in Jabłonka

Terms of reference: Carrying out  a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.

Duration: 2021

SW "Łeba"

 

Investment: “Implementation of innovations in the energy-fertilising treatment of sewage sludge and biodegradable waste, reducing negative environmental impacts
in a coastal tourist region.”

Terms of reference: Performing the function
of a technologist in the field
of sludge preparation for sequential fermentation, sequential operation of biogas plants and co-fermentation with biodegradable waste.

Duration: 2022-2023

Qaverage =7 500 m3/d

Pełczyce

 

Investment: “Extension and reconstruction of the treatment plant in Pełczyce.”

Terms of reference:
Works related to comprehensive technological service in the field of technological consulting and implementation of start-up works as part of the investment task and preparation of the necessary start-up and post-start-up documentation

Duration: 2022-2023

Qaverage = 900 m3/d

Municipal sewage treatment plants

 

Investment: “Technology consulting and commissioning work including preparation of commissioning and post-commissioning documentation for the investment in Dobroszyce, Kcynia, Klincz Wielki, Strzelce Krajeńskie and  Kałuszyn.”

Terms of reference:
Coordination and supervision of commissioning work , working as Commissioning Manager/Technologist

Duration: 2022-2023

Kościerzyna

Investment: Extension of the wastewater treatment plant in Kościerzyna in the field of sludge management.

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2022-2023

Qaverage = 3 500 m3/d

Łowicz

 

Investment: “Reconstruction and extension of the sewage treatment plant in Łowicz -Task IB (without hydrolysis).”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2022-2023

Qaverage = 13 000 m3/d

Białobrzegi

 

Investment: “Implementation of a technological concept for the Sewage Treatment Plant in Białobrzegi.”

Terms of reference:  
Development of a comprehensive
pre-investment analysis which will estimate the possibility of using the potential of biogas from municipal sewage sludge at the sewage treatment plant in Białobrzegi. Carry out a technical and economic audit and developing a concept for the modernization and expansion of the sludge part of the sewage treatment plant.

Duration: 2022

Qaverage =4 000 m3/d

Wołomin

Investment: Technological start-up of a sludge thickening installation with a capacity of 55 m3 / h, equipped with an AS-H belt thickener by Alfa Laval at the Wastewater Treatment Plant in Wołomin.

 

Duration: 2021

 

Bratoszewice

Investment: “Extension of the wastewater treatment plant in Bratoszewice”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2021

Qaverage = 550 m3/d

Wola Krzysztoporska

 

Investment: “Extension of the wastewater treatment plant in Wola Krzysztoporska with a reactor and biogas plant.”
In cooperation with Termoprojekt Zachód Sp. z o.o.

Terms of reference: Carrying out  a concept of installing a complete fermentation unit with biogas production and using it for energy production at the existing sewage treatment plant.

Duration: 2021

Qaverage =12 000 m3/d

2019 – 2020

Launch year

Elbląg

Investment: “Extension and modernization of the wastewater treatment plant in Elbląg street Mazurska 47- Element 1 implemented under the project: “Modernisation of waste water management in Elbląg agglomeration”

Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision. Holding the position of manager / start-up technologist.

Duration: 2020 – 2023

Qaverage = 22 000 m3/d

Biogas Plants Kutno 1 & 2

Investment: “Consultation  and technological supervision carried out during                      the construction process          of the Biogas Plant Kutno 2 (power 0.5 MW)  and process optimisation of the  the Biogas Plant Kutno 1                       (power 1.0 MW)”

Terms of reference:

support in design works,
technological supervision,
participation in acceptance work,
analysis of plant operation during commissioning,
analysis and optimisation of control systems.

Duration: 2020 – 2021

 

Białobrzegi

Investment: “Construction (modernization) and extension of the wastewater treatment plant in Białobrzegi”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2020 – 2021

Qaverage = 4 000 m3/d

Chrzanów Duży

Investment: “Modernisation of the biological part of the wastewater treatment plant in Chrzanów Duży” – task SD, AB and F (Grodzisk Mazowiecki)

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2019 – 2021

Qaverage = 21 000 m3/d

Mogilno

Investment: “Extension and modernization of the wastewater treatment plant in Mogilno”

Terms of reference: Technical and technological consultations during the implementation of the investment process. Carrying out commissioning works and supervision.

Duration: 2020 – 2021

Qaverage = 5 000 m3/d

Jaworzno – Dąb

Investment: “Modernization of the wastewater treatment plant in Jaworzno – Dąb Stage II”

Terms of reference: Carrying out commissioning works together with developing the necessary tests and documentation.

Duration: 2019 – 2020

Dęblin

Investment: “Extension and modernization of the wastewater treatment plant in Dęblin”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2019 – 2020

Qaverage = 4 000 m3/d

Józefów

Investment: “Integration and development of water and sewage management in Józefów”. Wastewater treatment plant in Józefów.

Terms of reference: Optimising the operation of the Bucher Unipektin AG piston press for sludge dewatering.

Duration: 2019

2017 – 2018

Launch year

Chynów

Investment: “Modernization and extension of the wastewater treatment plant in Sułkowice together with the management of municipal sewage sludge for the commune of Chynów in the town of Sułkowice”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2018 – 2019

Qaverage = 509 m3/d

Kościan

Investment: “Extension and modernization of the wastewater treatment plant” for Kościan in Kiełczewo

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2017 – 2019

Qaverage = 5 500 m3/d

Łask

Investment: “Extension and modernization of the wastewater treatment plant in Łask”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist. Coordination and supervision of start-up works for the whole task,

Duration: 2017 – 2019

Qaverage = 8 000 m3/d

Garwolin

Investment: “Extension and modernization of the wastewater treatment plant in Garwolin”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2017 – 2018

Qaverage = 5 500 m3/d

2013 – 2016

Launch year

Skarżyn

Investment: “Construction of a 1,56 MW electrical and heat generation installation form biogas in Skarżyn”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2015 – 2016

Heat output: 1,6 MWt

Swarzewo

Investment: “Extension and modernization of the wastewater treatment plant in Swarzewo”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2013 – 2016

Qaverage = 12 000 m3/d

Tomaszów Mazowiecki

Investment: “Modernization of the wastewater treatment plant and sewerage system for Tomaszów Mazowiecki agglomeration: Task No. 1.1, Task No. 1.2, Task No. 1.3.1a, Task No. 1.3.1.b”

Terms of reference: Carrying out a complete installation commissioning with start-up documentation, post-commissioning documentation and staff training. Holding the position of manager / start-up technologist.

Duration: 2013 – 2015

Qaverage = 12 000 m3/d

Full reference list available in our headquarter

J.V. Technology Witold Woroszyłło

EU VAT: PL 645-257-24-13
REGON: 520655980

Bank account: Santander Bank Polska S.A.
75 1090 1825 0000 0001 4928 2905

GDPR and Privacy policy

Photographs and text are property of J.V. Technology Witold Woroszyłło Sp. z o.o.

Poland

41-922 Radzionków
Street: Męczenników Oświęcimia 25/1
Silesia

+48 664 905 750

kontakt@jv-technology.pl

LinkedIn

Website design: eSpark Karol Wilczek